      玻璃鋼防腐管道安裝要求
      時間:2022-07-05  瀏覽:5776次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應(yīng)對設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進行復(fù)核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應(yīng)按圖紙的要求進行調(diào)整,調(diào)整方法可以利用支座達到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對傳動設(shè)備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機器連接前,應(yīng)防止強力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應(yīng)垂直安裝,在投入試運行時,要及時調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進行,開啟和回座壓力要符合設(shè)計文件的規(guī)定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設(shè)計文件核對其型號,并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時,閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關(guān)閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 麻豆果冻传媒精品一区| 图片区 小说区 区 亚洲五月| 中文字幕乱码在线人视频| 亚洲高清揄拍自拍| 超碰人人人| 日本无码人妻丰满熟妇区| 成人午夜免费一区二区三区| 天堂一区| 黑人精品XXX一区一二区 | 亚洲中文av一区二区三区| 日韩丝袜人妻中文字幕| 成人网站网址导航| 人妻二区三区| 无线日本视频精品| 国产成人精品无码片区在线观看 | 欧美人成精品网站播放| 国产综合久久久777777| 亚洲欧洲无码av一区二区三区| 国产制服丝袜在线视频| 天堂v亚洲国产ⅴ第一次| 欧美黑人又大又粗xxxxx| 日韩精品在线观看一二区| 一本色道无码不卡在线观看| 97夜夜澡人人爽人人模人人喊 | 久久国产成人高清精品亚洲| 久久99精品久久久久麻豆| 亚洲an日韩专区在线| 国产精品午夜福利麻豆| a∨无码天堂av| 欧美亚洲日韩精品一卡二卡| 欧美777| 欧美一区二区日韩国产| 久久99国产综合精品1| 国产精品女生自拍第一区| 精品福利导航| 亚洲精品av一区在线观看| 99久久久无码国产精品免费砚床| 精品乱码一区二区| 激情五区| 国产欧美日韩综合一区在线播放 | 欧美最猛性xxxxx黑人巨茎|